Title: Highland Hills Architectural Approval and Construction Policy
APPENDIX A Highland Hills Maintenance Commission
Project Review Application
Name of Owner(s)_____________________________ Date___________________Mailing Address ______________________________ Phone __________________
Parcel and Lot Number ___________________ Street Name ____________________
Construction Company: Phone:
Address _______________________ Person in charge of Project ________________
Estimated start date ______________ Estimated completion date ______________
Project Description: __New construction __Addition/alteration to existing structure or side
Check documents submitted:
___Copy of county-approved Short Plat of lot
___Exhibit(s) page of title insurance and special lot easements (see Section 3.6)
___Site Plan, to scale, showing: 2 copies___Proposed location of structure(s) on site with decks
Maximum building height is _____ft.
___All setbacks, easements (general, utility, special ingress/egress road easements, greenbelt areas, construction setbacks.
___Site clearing details, including location of trees to be removed
___Driveway location and exact interface with HHMC roads
___Off-road parking areas
___Engineered drainage plan, including location and size of culverts (if any)
___Copy of County building permit
___Propane tank location(s). Type of screening_______________________
___Floor Plan and specifications
___Elevations, including specific location of lowest footings of the structure and foundation details
___Other____Building main floor _____________sq. ft. Secondary floor _______sq. ft.
____Roofing materials:
____Exterior materials:
____Fence application per Board Policy 3-5
____Outbuildings description and details
____Other details
____$1,000 Environmental Protection Deposit payable to: Highland Hills Maintenance Commission
Signature of Applicants(s)____________________________________Date_____________
HHMC PC&Rs give the ACC 30 days in which to act on plans and specifications. Therefore, please submit material for committee review well in advance of anticipated starting date of construction.