Title: Highland Hills Architectural Approval and Construction Policy
APPENDIX C Project Completion Checklist
Final inspection sign-off by the county on the building permit.
___Final inspection sign-off by the county on the drainage system.
___Drain pipes into HHMC ditch baffled/stoned and buried.
___Other drain pipes on the property buried.
___No obvious or potential drainage problems.
___Hard surface road apron installed.
___Driveway-HHMC road interface as planned.
___Propane tanks installed and screened.
___Roof material as specified.
___Lot clean and no slash, debris, building materials or equipment left around.
___Cut firewood stacked.
___All signs removed.
___Exterior completed, painted, etc.
___No obvious or immediate need for heavy equipment at the site.
___Project completed. ___
Project not completed because of: ________________________________
AAC Member: _________________________ Date: _________
Date Owner Advised: ________ By: __________________________
Date Refund Request to Treasurer: ________ By: _____________________
Mark items as yes, no, or n/a